购彩大厅注册,凤凰彩票平台官网登录,bob软件下载安卓,767娱乐app官方版下载v1,88彩票在线购彩,亚博网投信用好,百姓彩

  Homepage      Favorite      中文版
Home About Us News info Products Services Recruitment Contact us
NEWS CENTER
Company News
Trade News
Exhibitions
Videos
CONTACT US
Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
Tel: +86-592-6539999
E-mail: bussiness@xmzzj.com

NEWS CENTER
Location:Home → News Center
Loader operating specification
Public date:2017-7-26   Hits:6592

Good operating habits to extend the life of your equipment doubled

1, bucket transport height

★ illegal operation: with a high load arm walking loading, easy to cause the boom cylinder bending failure.

★ standard operation: the fighting state, the bottom of the bucket 40-50 cm off the ground, the slope to minimize.

2, the operation, should make the loader straight on the front, before and after the frame should be in a straight line.

3, prohibit the use of inertia high-speed plug into the pile, should rely on the driving force of the loader straight cut.

4, the bucket cut into the angle is too large, all the load added to the front axle, resulting in the rear wheel vacant, prone to the front axle from the original screw teeth, axle or even the front axle support shaft fracture and other failures.

5, prohibit the use of bucket corner digging hard materials, or prone to boom deformation, cylinder damage and other failures.

6, the bucket inserted into the pile, you should first fight and then start the arm, or will cause the boom deformation.

7, with a high load arm walking loading, easy to cause the boom cylinder bending failure.

8, can not be carried out in the high digging operations or bucket bump material, so as not to arm arm cylinder bending.

9, after discharge, should first stop or part of the resumption of operation and then move the arm, otherwise it will cause "pull the cylinder", damage dump tank.

10, the bucket of the block by a long time due to deformation caused by deformation, wear, the timely repair welding to ensure that the bucket of the block in the normal bar, the discharge position to play an effective limit role.

★ If the limit block wear is not timely repair welding, will cause rocker deformation, fracture failure!

11, wading operations, the water does not exceed the drive axle or gearbox output shaft seal the lowest parts.

12, cabin, underground operating conditions, the engine to be installed tail gas treatment device.

Previous  |  Next  |   Return to
About Us
Company profile
Culture
Organizational
Development
Subsidiaries
Certificates
Products
Wheel Loader
Block Handling Wheel Loader
Excavator
Other
Spare Parts
News
Company News
Trade News
Exhibitions
Videos
Services
Marketing
After Services
Question
Downloads
Recruitment
Talent Concept
Jobs
Contact Us
Feedback
Contact us
Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
Two-dimensional [Close]

點(diǎn)擊這里給我發(fā)消息
點(diǎn)擊這里給我發(fā)消息
庐江县| 宜兰县| 治多县| 苏尼特右旗| 万州区| 旺苍县| 博客| 道孚县| 隆林| 寿宁县| 尉氏县| 中西区| 札达县| 马鞍山市| 菏泽市| 奉新县| 五常市| 北川| 平谷区| 博兴县| 若尔盖县| 秦安县| 讷河市| 闽侯县| 临湘市| 清远市| 名山县| 威宁| 罗源县| 当雄县| 泰顺县| 吴堡县| 托克逊县| 吴江市| 双柏县| 吉木萨尔县| 景洪市| 富宁县| 宁德市| 汉源县| 达孜县|